Windpark Jeetze

Jeetze-Kahrstedt is a high-performing onshore wind farm in the Altmark region. Comprising five wind turbines, it makes an important contribution to the region’s sustainable energy supply.
Installed capacity
15.375 MW
Annual output
Approximately 47,546 MWh
Commissioned
End of 2013
Project location map

Project Description

Location

The wind farm is located near the villages of Jeetze and Kahrstedt in the municipality of Kalbe (Milde), within the Altmarkkreis Salzwedel district. The area’s open landscape and average wind speeds of more than 7 m/s provide very favourable conditions for efficient wind energy generation.

The electricity generated is fed into the Avacon AG grid via the Güssefeld substation.

Project

Jeetze-Kahrstedt Wind Farm was commissioned at the end of 2013. All wind turbines were acquired on a turnkey basis and have been generating renewable electricity reliably ever since.

The wind farm has a total installed capacity of 15.375 MW. With a projected annual energy yield of approximately 47.5 million kWh, it ranks among Germany’s higher-yielding inland wind projects.

Wind Turbines

The wind farm comprises five turbines manufactured by Vestas:

  • 5 × Vestas V112
    • Hub height: 140 m
    • Rotor diameter: 112 m
    • Total installed capacity: 15.375 MW

The high-performance turbines harness the site’s very favourable wind conditions, enabling efficient and high-yield electricity generation.

Project Data

  • Annual electricity generation: Approximately 47,546 MWh
  • Installed capacity: 15.375 MW
  • Number of turbines: 5
  • Turbine model: Vestas V112
  • Hub height: 140 m
  • Rotor diameter: 112 m
  • Commissioned: End of 2013
  • Grid connection: Güssefeld substation
  • Distribution network operator: Avacon AG
  • Location: Municipality of Kalbe (Milde), Altmarkkreis Salzwedel, Saxony-Anhalt, Germany